The challenge During the initial tender, there was uncertainty regarding the execution as well as the practical and organisational details of the work. Thanks to our professional approach and our proactive collaboration with the client, clear work plans have now been…
Underwater inspections at the PHP car park at De Entree
The challenge The inspections took place in a busy construction environment with limited space. Because works were ongoing in and around the station, a precise and structured approach was required to ensure that all inspection points were reliably documented. All heavy…
Repair of the HDD4 tube
The challenge The HDPE pipe was intended to carry a large power cable from sea to shore. The internal diameter of the pipe was less than 60 cm. The pipe sloped downwards and was filled with water. To reach the earth…
Underwater anchoring test phase at Seinehaven
The challenge The technical challenges involved in this project were entirely new, and a fresh, creative approach was required. Because the work formed part of a developing concept, the bar was set high during both the preparations and the execution of…